M&E design and coordination for Frankfurt Data Centre's power modules.
Get in touch +Project info
A design and build M&E contractor required specialized support for the Frankfurt Data Centre, involving 34 roof-mounted power distribution modules. The challenge was integrating a MV Switchroom, 4MVA transformer, dual 2 MW UPS systems, a battery room, and cooling systems into the design, with Calmor selected for our expertise in European data centre power distribution.
Calmor was tasked with equipment selection and creating a fully coordinated detailed design for installation, including an As-Built model. We led weekly design team meetings and provided ongoing support during the design approval process, acting as an extension of the client's design team to ensure quality and efficiency.
01 -
Resource Optimization: Calmor's role allowed the client to allocate internal resources more effectively, ensuring high-quality delivery.
02 -
Precision in Coordination: With extremely tight constraints, our 3D model was critical for precise service coordination and visualizing the project.
03 -
Design Expertise: Our mechanical and electrical design expertise ensured that all client specifications were met to the highest standards.
04 -
Project Management: Provided comprehensive construction and project management support, contributing to a streamlined project lifecycle.
05 -
Comprehensive Support: Through each phase, from design to construction, Calmor delivered consistent M&E design and construction support.