M&E redesign for Dungannon CU's refurb, ensuring zero downtime.
Get in touch +Project info
Dungannon Credit Union embarked on a crucial refurbishment of their building, necessitating a meticulous design to maintain operations and avoid server downtime. With a project value of £900k, the union required a design team adept in construction sequencing for the dual-phase upgrade, emphasizing business continuity to circumvent significant penalties due to financial regulations.
Calmor was entrusted with the comprehensive M&E design for the refurbishment, with the primary challenge of ensuring zero operational downtime. Drawing on our hands-on experience, we orchestrated the project phases to ensure ongoing operations, aligning with the contractor's appointment. The design and construction phases spanned 3 and 12 months respectively.
01 -
Operational Continuity: Achieved zero downtime, keeping server room power and cooling services active throughout the refurbishment.
02 -
Phased Implementation: Expertly phased project to support continuous business operations during the refurbishment.
03 -
Turnaround Efficiency: Prompt and effective responses at tender and detailed design stages accelerated project delivery.
04 -
Seamless System Transition: Ensured a smooth transition to the new system with no disruption to credit union services.
05 -
End-to-End Support: Provided consistent tender, procurement, and construction support, enhancing project stability and success.