Mechanical and electrical design for the food production facility to British Retail Consortium Specifications
Get in touch +Project info
An established design & build mechanical and electrical contractor appointed us to carry out the M&E design for a new mushroom production facility.
The project consisted of new MV substation & transformer with associated electrical services and mechanical services, including air handling units to meet Tesco, Sainsburys and BRC food specifications.
Due to the ‘split-level’ nature of the site and no option to penetrate the floor slab above, there were significant space constraints on this project.
Since the Calmor team have significant experience in Construction Management, we were able to work efficiently with the structural, civils and architectural teams to work around the space constraints.
01 -
Smooth integration with rest of design team
02 -
Previous site experience allowed us to quickly coordinate services in lower ground floor ceiling void at the beginning of the project, allowing the structural steelwork to be ordered before fully designing the M&E services
03 -
04 -
05 -