Electrical design and fit out of over 100 modular UPS Power Distribution Pods
Get in touch +Project info
Our client was presented an opportunity to carryout the electrical design and fit out of over 100 modular UPS Power Distribution Pods / switch rooms across several countries with extremely tight timescales and even tighter space constraints due to limited maximum physical size for transportation bringing its own set of engineering challenges. This coupled with each region having their own set of local regulations left no room for error and no time in the project for second chances.
Our client wanted to partner with us as we have previous experience working on large hyper-scale data centres across Europe and trusted that we could deliver for them.
Our client knew we had the technical expertise, capacity to work within their timescales and the required software to carry out the necessary calculations and 3D modelling
01 -
Full coordination achieved between all services BEFORE starting any installation activities
02 -
‘Right First Time’ approach avoiding re-work
03 -
Projects delivered successfully on time and budget
04 -
05 -
Do you have a project that requires mechanical and electrical design expertise?
Get in touch +